Flößgraben/Leina' River Maintenance Association

Operation name
2015 GZ 0033
Operation summary
Creation of ecological passability along the reed water in OL Friedrichroda by the deconstruction of transverse structures and construction of a rock ramp (section 6300 - Bachstraße) - TA 1: Planning LPh 1 to 7 including preparatory works and TA 2: LPh 8
Operation start date
29.06.2016
Operation end date
30.05.2020
Total eligible expenditure allocated to the operation
602.843,48
Union co-financing rate
80 %
Operation postcode
99894
Country
Deutschland
Name of category of intervention
085 - Protection and enhancement of the biodiversity, nature conservation and green infrastructure