ASS-Einrichtungssysteme GmbH (Furnishing systems))

Operation name
2015 EEI 0087
Operation summary
Optimisation measures on the extraction system, installation of a higher-level control system for the existing compressed air system, conversion of the lighting to LED lighting in the company, and insulation of the press tools
Operation start date
10.11.2015
Operation end date
31.10.2016
Total eligible expenditure allocated to the operation
65.666,66
Union co-financing rate
80 %
Operation postcode
07330
Country
Deutschland
Name of category of intervention
068 - Energy efficiency and demonstration projects in SMEs and accompanying measures