Project: ERDF is being lived in Thuringia

According to the guidelines for the use of technical assistance from funds of the European Regional Development Fund (ERDF) in the 2014-2020 funding period for the implementation of the ERDF operational programme - Point 9 Publication Disclosure Obligations - the beneficiary has to take all information and communication measures in accordance with Art. 115 (3) in conjunction with Annex XII VO (EU) 1303/2013 to refer to the support of the project by the ERDF.

The list below provides an overview of all projects in the 2014-2020 funding period. You can search directly by the name of the beneficiary or find the projects at a location by typing in the postcode.

Beneficiary name
Operation start date
Operation end date
Operation postcode
Martin Dellit Präzisionsdreherei GmbH & Co. KG (Precision Turning Shop)
01.01.2020
31.10.2020
98593
Implementation of a central machine cooling system for energy-efficient refrigeration and renewal of the compressed air systems to reduce the energy requirement for compressed air generation and preparation
Show detail
Martin Strümpfel and Stefan Dietzel GbR
28.05.2018
27.05.2020
07333
Implementation of constructional investments and acquisition of new machinery and equipment as well as intangible assets for the company
Show detail
Martin Strümpfel and Stefan Dietzel GbR
26.03.2019
20.03.2021
07333
Implementation of constructional investments according to the energy consultancy report for the company
Show detail
Maschinen und Technik GmbH GROMATEC (Machines and Technology)
21.06.2018
31.10.2018
99439
Acquisition of new machinery and equipment for the company
Show detail
Maschinen- und Stahlbau Wilfried Sachse (Mechanical Engineering and Steel Construction)
01.12.2016
31.05.2017
07629
Purchase of a new CNC plasma cutting system for the company
Show detail
Maschinenbau Böhner prop. Maik Böhner (Mechanical Engineering)
21.05.2018
21.05.2019
99755
Implementation of constructional investments and acquisition of new machinery and equipment as well as intangible assets for the company
Show detail
Maschinenbau Olaf Eckardt (Mechanical Engineering)
01.12.2015
31.10.2016
99510
Implementation of an energy efficiency measure (situation analysis) for the company Olaf Eckardt Maschinenbau
Show detail
Maschinenhandel Gries prop. Mario Gries (Machinery Trade)
05.06.2019
31.12.2019
99974
Acquisition of new machinery and equipment for the company
Show detail
Institute of Material Research and Testing at Bauhaus-University-Weimar
01.07.2016
30.06.2019
99423
Development of fatigue endurable components for high-pressure system components for impulse pressure test systems up to 8000 bar.
Show detail
Institute of Material Research and Testing at Bauhaus-University-Weimar
01.04.2016
30.09.2019
99423
Micromechanical laboratory for simulation and in-situ monitoring of damage to heterogeneous materials ('MicroLab')
Show detail