Project: ERDF is being lived in Thuringia

According to the guidelines for the use of technical assistance from funds of the European Regional Development Fund (ERDF) in the 2014-2020 funding period for the implementation of the ERDF operational programme - Point 9 Publication Disclosure Obligations - the beneficiary has to take all information and communication measures in accordance with Art. 115 (3) in conjunction with Annex XII VO (EU) 1303/2013 to refer to the support of the project by the ERDF.

The list below provides an overview of all projects in the 2014-2020 funding period. You can search directly by the name of the beneficiary or find the projects at a location by typing in the postcode.

Beneficiary name
Operation start date
Operation end date
Operation postcode
Ostthüringische Materialprüf gesellschaft für Textil und Kunststoffe mbH Rudolstadt (East Thuringian Company for Material Testing of Textiles and Plastics)
04.05.2015
31.01.2016
07407
Acquisition of new machinery and equipment for the company
Show detail
Ostthüringische Materialprüf gesellschaft für Textil und Kunststoffe mbH Rudolstadt (East Thuringian Company for Material Testing of Textiles and Plastics)
01.04.2017
30.09.2019
07407
Process development for the vacuum-free deposition of components of dye solar cells on textile-based solar fabrics by using cast coating technology based on slot-die-coating
Show detail
Ostthüringische Materialprüf gesellschaft für Textil und Kunststoffe mbH Rudolstadt (East Thuringian Company for Material Testing of Textiles and Plastics)
01.05.2016
28.02.2017
07407
Acquisition of new machinery and equipment for the company
Show detail
Ostthüringische Materialprüf gesellschaft für Textil und Kunststoffe mbH Rudolstadt (East Thuringian Company for Material Testing of Textiles and Plastics)
15.10.2018
31.12.2019
07407
Acquisition of new machinery and equipment for the company
Show detail
Otto Crienitz KG Obermühle
15.11.2017
30.06.2018
07570
Implementation of an energy efficiency consultation (situation analysis) for Otto Crienitz KG Obermühle
Show detail
Outdoorcamp Hohenfelden prop. Thomas Lang
28.01.2019
30.06.2019
99448
Implementation of constructional investments and acquisition of new machinery and equipment for the company Outdoorcamp Hohenfelden
Show detail
Outfit-Storekonzept GmbH & Co.KG
15.07.2015
01.07.2016
99091
Constructional investments and purchase of new machinery and equipment as well as intangible assets for the company
Show detail
PA-Vermögens-GbR Gerald Wagner and Albrecht Hamatschek (Asset Management)
01.01.2017
31.12.2018
98527
Implementation of constructional investments and acquisition of new machinery and equipment by PA-Vermögens-GbR (holding company) for leasing to PREMETEC Automation GmbH (operating company)
Show detail
PAARI Waagen- und Anlagenbau GmbH & Co. KG (Scale and Plant Engineering)
04.05.2018
31.07.2018
99095
Feasibility study for the partial cooling of assemblies of an outdoor control cabinet to reduce the energy consumption for cooling
Show detail
PARIMEO GmbH
01.03.2019
31.07.2021
07743
Implementation of constructional investments and acquisition of new machinery and equipment for the company
Show detail