Project: ERDF is being lived in Thuringia

According to the guidelines for the use of technical assistance from funds of the European Regional Development Fund (ERDF) in the 2014-2020 funding period for the implementation of the ERDF operational programme - Point 9 Publication Disclosure Obligations - the beneficiary has to take all information and communication measures in accordance with Art. 115 (3) in conjunction with Annex XII VO (EU) 1303/2013 to refer to the support of the project by the ERDF.

The list below provides an overview of all projects in the 2014-2020 funding period. You can search directly by the name of the beneficiary or find the projects at a location by typing in the postcode.

Beneficiary name
Operation start date
Operation end date
Operation postcode
SSB Stark Stahlbau GmbH (Steel Construction)
18.04.2019
30.08.2019
98553
Acquisition of new machinery and equipment for the company
Show detail
STAHLBAU-ROSSLEBEN GmbH (Steel Construction)
01.03.2016
31.12.2016
06571
Acquisition of a new CNC plasma cutting system for the company
Show detail
STAMM Blechtechnik GmbH & Co. KG (Sheet Metal Technology)
01.10.2019
30.04.2020
96515
Implementation of an energy efficiency consultation (situation analysis)
Show detail
STB Prüfinstitut für Baustoffe und Umwelt GmbH (Testing Institute for Building Materials and The Environment)
06.12.2016
31.07.2017
99098
Development of deformation-resistant road surface layers by internal reinforcement of the structural matrix with fibrous materials.
Show detail
STRAB Ingenieurholzbau Hermsdorf GmbH (Timber Engineering)
01.09.2016
31.03.2017
07629
Manufacturability of a resource-saving, durable glued laminated timber made of Robinia
Show detail
STRAUB KG
18.01.2017
31.10.2017
99867
Conversion investment in a regulated compressor with heat recovery
Show detail
STRAUB KG
18.02.2019
31.03.2020
99867
Conversion of the lighting to LED technology with daylight-dependent control
Show detail
STÄRKER-PROFIL GmbH
18.11.2019
30.07.2020
99099
Implementation of constructional investments and acquisition of new machinery and equipment for the company
Show detail
SWM Werkzeugfabrik GmbH & Co. KG (Tool Factory)
25.04.2016
31.10.2016
98587
Implementation of an energy efficiency consultation (situation analysis) for the company SWM Werkzeugfabrik GmbH & Co. KG
Show detail
SWM Werkzeugfabrik GmbH & Co. KG (Tool Factory)
01.12.2017
30.04.2018
98587
Purchase of an air compressor with refrigeration dryer in the toolmaking area including continuous control of the drainage system and acquisition of an air compressor with refrigeration dryer in the forging area for the company
Show detail