Project: ERDF is being lived in Thuringia

According to the guidelines for the use of technical assistance from funds of the European Regional Development Fund (ERDF) in the 2014-2020 funding period for the implementation of the ERDF operational programme - Point 9 Publication Disclosure Obligations - the beneficiary has to take all information and communication measures in accordance with Art. 115 (3) in conjunction with Annex XII VO (EU) 1303/2013 to refer to the support of the project by the ERDF.

The list below provides an overview of all projects in the 2014-2020 funding period. You can search directly by the name of the beneficiary or find the projects at a location by typing in the postcode.

Beneficiary name
Operation start date
Operation end date
Operation postcode
Rissland Kunststoffe GmbH (Plastics)
01.08.2016
31.08.2017
98746
Replacement of the existing drives and use of waste heat in the company Rissland Kunststoffe GmbH
Show detail
Rissland Kunststoffe GmbH (Plastics)
01.01.2018
22.05.2018
98746
Acquisition of new machinery and equipment for the company
Show detail
Rissland Kunststoffe GmbH (Plastics)
01.09.2019
31.10.2019
98746
Implementation of an energy efficiency consultation (situation analysis) for the company Rissland Kunststoffe GmbH
Show detail
Rittergut Positz GmbH (Manor Hotel)
30.06.2015
29.06.2017
07381
Implementation of constructional investments and acquisition of new machinery and equipment for the company
Show detail
Rittergut Positz GmbH (Manor Hotel)
09.04.2019
08.04.2020
07381
Implementation of constructional measures and acquisition of new machinery and equipment for the company
Show detail
Robert Boyle Institute, Association for Ecolog. Biomass Utilisation, Bioenergy for Safeguarding Drinking Water
01.12.2018
30.11.2021
07751
IGM functional element interior wall: KLIMA cassette - development and demonstrator production
Show detail
Robert Boyle Institute, Association for Ecolog. Biomass Utilisation, Bioenergy for Safeguarding Drinking Water
23.12.2019
31.10.2020
07751
Development and production of novel adsorbents based on biogenic carbon materials for sorption processes in sewage treatment and drinking water purification.
Show detail
Robert Nagel Trockenbau- Brandschutz-Akustik GmbH & Co. KG (Dry Construction - Fire Protection - Acoustics)
29.04.2016
31.12.2016
99091
Implementation of constructional investments and acquisition of new machinery and equipment for the company
Show detail
Robert Papsch-Café, Bistro prop. Robert Papsch
01.05.2016
30.04.2018
99084
constructional investments and acquisition of new machinery and equipment for the company
Show detail
Robertson proprietor Robert Allekotte e.K.
29.01.2016
31.07.2016
99510
Implementation of constructional investments for the company
Show detail