Project: ERDF is being lived in Thuringia

According to the guidelines for the use of technical assistance from funds of the European Regional Development Fund (ERDF) in the 2014-2020 funding period for the implementation of the ERDF operational programme - Point 9 Publication Disclosure Obligations - the beneficiary has to take all information and communication measures in accordance with Art. 115 (3) in conjunction with Annex XII VO (EU) 1303/2013 to refer to the support of the project by the ERDF.

The list below provides an overview of all projects in the 2014-2020 funding period. You can search directly by the name of the beneficiary or find the projects at a location by typing in the postcode.

Beneficiary name
Operation start date
Operation end date
Operation postcode
Thuringian State Office of Environment, Mining and Nature Conservation
18.12.2014
31.12.2021
04603
Pleiße, Windischleuba flood protection townsite
Show detail
Thuringian State Office of Environment, Mining and Nature Conservation
30.09.2014
30.06.2021
07548
New construction of flood protection, construction area 1 (Untermhäuser Brücke up to Heinrichsbrücke)
Show detail
Thuringian State Office of Environment, Mining and Nature Conservation
18.12.2014
31.12.2021
99817
Hörsel, flood protection Eisenach, Rothenhof, MK IV
Show detail
Thuringian State Office of Environment, Mining and Nature Conservation
11.08.2014
31.12.2023
98673
Werra Eisfeld expansion, new building construction
Show detail
Thuringian State Office of Environment, Mining and Nature Conservation
01.01.2015
31.12.2020
98553
Schleuse Rappelsdorf, expansion, concept for new construction
Show detail
Thuringian State Office of Environment, Mining and Nature Conservation
01.01.2015
31.12.2018
98678
Werra Sachsenbrunn expansion, new construction townsite Sachsenbrunn bridge surroundings B281-construction
Show detail
Thuringian State Office of Environment, Mining and Nature Conservation
24.11.2014
31.12.2018
36414
Ulster fron Pferdsdorf to Motzlar development of a flood control concept Ulster - Conzept
Show detail
Thuringian State Office of Environment, Mining and Nature Conservation
15.12.2014
31.12.2021
98527
Hasel from Wichtshausen to Dietzhausen establishment of passability BA IV HA 27-33
Show detail
Thuringian State Office of Environment, Mining and Nature Conservation
18.12.2014
31.12.2019
98527
Hasel from Dietzhausen to Mäbendorf establishment of passability BA V-HA 39-48 - Konzept
Show detail
Thuringian State Office of Environment, Mining and Nature Conservation
01.03.2016
30.09.2020
07745
Management planning for 62 Natura 2000 sites in Thuringia
Show detail